Group| AG| 中文
CPOE > Performance > Well Services
Well Services
Performance for Workover
Workover

From 2009 to 2015,we have provided services for CNOOC 33 wells around 300 days (conventional workover and pump inspection, dual tubing well overhaul, high rate gas well pump inspection, high pressure gas well abandonment, drilling and well completion support) .

Performance for Well Testing
Client Well No. Feature technology Highlight
CNOOC NB13-4-1
HY2-21
HALLIBURTON APR tools Improve the success rate of gas test
CNPC CH33 Conventional well testing
Nitrogen gas lifting
TCP+STV+JET combination
High temperature and high pressure,Quick clean-up
Thailand TPI NP3-1705
Chatturat-2
Monitor pressure gage+ MFE + test pressure gage+BT open hole packer+ heavy sieve tube+drill collar Open hole test,Quick test and strike oil
CNPC MD1
NP2406
DS4
Screw +LPR -N+RD+RTTS packer+ sieve tube Sand entry seriously
CNPC HN24-1 TCP+STV+JET combination Straddle distance 180m
Iraq WQ2-213/178/134 HALLIBURTON APR tools High rate well testing
Thailand Chatturat-2
YPT7
Gas test 1st first gas test overseas
Performance for stimulation
Client Well No. Feature technology Highlight
CNOOC WENCHANG 13-1-A12 Fracturing Use continue blender skid to mix fracturing liquid
CONOCOPHILLIPS PENGLA I193 Sand control Offer the experience of offshore oilfield integrate development
China Geology survey BH4/6/7 Two ships cooperation Total liquid are 424.3m3, the max proppant rate is 35.3%,the max pressure is 72MPa
CNPC NP1-80 large-scale acidizing There are 497m3 acid liquid in total
SINOPEC   Separated layer acidizing, sand control Carry out variety pump service, provide maintain service for production well and water injection well
Thailand YPT7 Large-scale fracturing integrate service include design, operation and evaluable
Performance for coiled tubing
Client Well No. Feature technology Highlight
CNOOC
(SOUTH CHINA SEA)
HZ 25-7 -3D semi-submerged platform Sea condition is uncontrollable
CNOOC
(BOHAI BAY)
BZ 34-1 NC05 Chemical cutting, punch a hole Cut and punch a hole go through tubing in high angle deviated well
CNOOC
(EAST SEA)
TWTA5H1 high angle deviated well The max angle is 93°horizontal distance is 1100m
CNPC ZHAO 13 Grinding technology H2S well and knotty well
CNOOC
(BOHAI BAY)
JZ9-3W9-4 Fishing technology There are three bottom hole water regulators