Offshore drilling services began in 1980s', aiming at ensuring the safety and cost-effective for clients. Currently owing 14 drilling rigs, 5 workover and well-testing platforms and managing an Ultra-deep Semi-submersible. Besides, we also provide directional drilling services. With the experienced and well-organized drilling team, faster ROP can be guaranteed.
Core Technique:
- Drilling System Assembling and Commissioning Technique
- Batch Drilling Technique
- Horizontal Well Drilling Technique
- Casing Drilling Technique
- Safe Drilling Technique in High Pressure Sour Gas Field
- Drilling System Assembling and Commissioning Technique
-
With the experience of building rigs in the past years, we own a group of experienced, skilled team who are specialized in the construction supervision, assembling, adaption modification, commissioning etc. and successfully provided the drilling system assembling and commissioning services for Qing Dao Shipyard, DSIC, CIMC Raffles, China SWS and CPTDC.

Maintenance Serves
- Batch Drilling Technique
-
Through co-ordinate project resources, optimize resource allocation, optimize operational processes, fine management, highly efficient communication and collaboration, we have shorten the drilling cycle drastically. With the application of batch drilling organization technique, 29 cluster wells group, 310 wells have been completed and total footage was up to 449,700 meters. For example, one well group in the Bohai bay, 13 wells have been drilled and completed, the total footage was 27,600 meters, which lasted 156 days, 21 days ahead of the design period.

- Horizontal Well Drilling Technique
-
Rotary steering tools and MWD instruments, optimize parameters, effective control of the well trajectory, have been successful used in special reservoir development. By now, we have completed 7 large displacement wells whose displacement exceeds more than 3000 meters, and also more than 140 horizontal wells. Such as:
In ZDC42 (HI) well, drilling TD was 4620m, vertical depth was 1,388m, horizontal displacement was 3,975m and horizontal displacement to vertical depth ratio was 2.86.
- Casing Drilling Technique
-
Zhao Dong platform has accomplished 24 wells of surface casing drilling work. The drilling depth is 6152.3m. Average ROP is 62.64m/h. The highest ROP is 234.75m/h. It has renewed world record at the time and the efficiency is twice as normal drilling.
The highest ROP on JDNP3-5 well, whose surface layer has used casing drilling technology, is 129.16m/h. It has shortened about 40% drilling time compared to normal drilling in surface layer.

- Safe Drilling Technique in High Pressure Sour Gas Field
-
With 8 years practices in the high-pressure sour gas field in the Middle East Area where the H2S content is more than 3000ppm, CPOE accumulated rich drilling experience through equipping the rig with high performance H2S equipment and facilities, developing the emergency program, optimize the drilling fluid and so on. With such measures, there is no H2S incidence to our people occurred and safe drilling was achieved. In addition, our technique was also successfully applied in many HPHT and High sour gas wells for CNOOC in China.


NP1-3 Project Drilling-Production-Installation

Deepwater Hydra Gas Extraction

Directional Drilling Service